BUNKER

WHARFS

Onshore bunkers

With state-of-the-art bunkering installations

All in compliance with ISO 8217:2012 standard

Onshore bunkers are delivered via pipeline at any of the below wharfs. Truck delivery is subject to the terminal and berth regulations. Bunker-only vessels, container vessels, refinery vessels, militarily vessels, cruise ships, oil rigs and mega yachts are all served according to their specific needs.

 

With state-of-the-art bunkering installations and 24 /7 year-round bunkering services, ships can be served simultaneously at several wharfs in the harbors, avoiding costly delays. Delivered fuels are all in compliance with ISO 8217:2012 standard. For offshore bunkering Curoil has a fully class certified bunker barge available for deliveries in both Curacao and Aruba waters.

 

Prins Hendrik Wharf

Located in the Schottegat Bay on the North-Western corner of the St. Anna Bay with a length of 211m and a draft of 10.4m. The construction is of steel piles, concrete top and concrete floor. The main functions are for lay-by berth and for bunkering. Freshwater is available by pipe and bunker ex-pipe.

 

Oranje Wharf

Located at the West side of the St. Anna Bay with a length of 90m and a draft of 5.8m. The construction is sheet piling and concrete top. The main functions are for lay-by berth and for bunkering. Freshwater is available by pipe and bunker ex-pipe.

 

Motet Wharf

Located on the West side of the St. Anna Bay with a length of 190m and a draft of 10.1m. The construction is sheet piling and concrete top. The main functions are for lay-by berth, alternative cruise terminal and for bunkering. Freshwater is available by pipe and bunker ex-pipe.

 

Nieuwe Wharf

Located on the West side of the St. Anna Bay with a length of 170m and a draft of 10.1m. The construction is sheet piling and concrete top. The main functions are for lay-by berth, cruise passenger terminal and for bunkering. Freshwater is available by pipe and bunker ex-pipe.

 

West Wharf I

Located on the West side of the St. Anna Bay with a length of 146m and a draft of 7.7m. The construction is sheet piling, concrete top and asphalt floor. The main functions are for lay-by berth, cruise passenger terminal and for bunkering. Freshwater is available by pipe and bunker ex-pipe.

 

West Wharf II

Located on the West side of the St. Anna Bay with a length of 132m and a draft of 11m. The construction is sheet piling, concrete top and asphalt floor. The main functions are bunkering and cruise passenger terminal.

Facilities are water through fire hose from Nieuwe Wharf and bunkering ex-pipe.

 

Mathey Wharf

Located on the West side of the St. Anna Bay with a length of 198m and a draft of 9.90m. The construction is sheet piling, concrete top and asphalt floor. The main functions are bunkering and cruise passenger terminal.

Freshwater is available by pipe and bunkering ex-pipe.

 